Staunton-on-Wye Primary School

Status: Completed 2010

M&E Engineer: Ernest Griffiths

Quantity Surveyor: Smith Thomas Consult

Contractor: Thomas Vale Construction

The design process included an extensive consultation with staff, students and parents which arrived at a series of key points for inclusion in the brief:

  • A secure and welcoming entrance.

  • A simple plan allowing for passive surveillance of students.

  • A building section that maximises natural light while allowing natural ventilation.

  • Flexible and agile spaces.

  • Direct link to the outside from every classroom.

  • This project was completed as Project Architect at Architype Architects using a traditional contract.

DSC_1822.JPG

“…the work done on education for sustainable development and the involvement of pupils in planning the new school building are exemplary.

— offsted inspector

Previous
Previous

Parc Y Tywyn Primary School