Staunton-on-Wye Primary School
Status: Completed 2010
M&E Engineer: Ernest Griffiths
Quantity Surveyor: Smith Thomas Consult
Contractor: Thomas Vale Construction
The design process included an extensive consultation with staff, students and parents which arrived at a series of key points for inclusion in the brief:
A secure and welcoming entrance.
A simple plan allowing for passive surveillance of students.
A building section that maximises natural light while allowing natural ventilation.
Flexible and agile spaces.
Direct link to the outside from every classroom.
This project was completed as Project Architect at Architype Architects using a traditional contract.